Abstract: The 2010-2012 implementation plan of the European Sustainable Nuclear Industrial Initiative (ESNII), in the frame of the Sustainable Nuclear Energy Technology Platform (SNE TP), establishes a very tight time schedule for the start of construction of the European Gen IV prototypes; namely the construction of the LFR ETPP (European Technology Pilot Plant) Myrrha will start in 2014 and that of the SFR Prototype ASTRID will start in 2017. The GEN IV reactors pose new challenges to the designers and scientists in terms of higher operating temperatur...
(read more)
Topics: 
Mechanical engineering
Nuclear engineering
Manufacturing engineering