Abstract: 1 during the years of operation. In 2010, after two years of operation, the oxidation/nitrification tank was changed to work in alternate cycles of aerated and anoxic conditions, in order to improve the denitrification process. The MBR, working at a mean sludge retention time of 144 days and with mixed liquor suspended solids of 17 g/L, achieved high removal rates of conventional contaminants, with more than 98% for Biochemical Oxygen Demand, 96% for ammonium, and 75% for Chemical Oxygen Demand (COD). From the COD balance, half the COD entering...
(read more)
Topics: 
Environmental engineering
Waste management
Pulp and paper industry