Abstract: Introduction. To solve the problem of accelerating the construction of roads, improving their quality, it is advisable to use a continuous action unit to form a underlying layer. The main working elements of this unit are buckets, which cut off the soil layer from below and side. At the same time, the bottom knife cuts off the ground layer from below, the right knife - on the side, and the console knife partially cuts the top layer of soil from below for the next bucket. In particular, the analysis of interaction with the ground of the bottom k...
(read more)
Topics: 
Geotechnical engineering