Abstract: Studies indicate that there is a relationship between project cost and construction time for different construction markets. The purpose of this study was to validate the time-cost relationship model developed by Bromilow et al. (1980) in the context of commercial, residential, and industrial construction projects in India. The model was extended to include the magnitude of the projects in terms of gross floor area and construction types, to determine whether these variables also have an effect on project duration. Data related to 99 constructi...
(read more)
Topics: 
Operations research
Statistics
Operations management